Biomethane plant Pessin

PROJECT DESCRIPTION

The Pessin biomethane plant was developed, designed and built to produce biogas from biomass, which is upgraded to biomethane by means of gas treatment (based on pressure swing adsorption). The feedstocks, which are stored in 4 silo chambers on site, are corn and grass silage, GPS, sugar beets, cattle manure and solid manure. A total of 64,000 t/a are processed. The gas system and gas upgrading of the plant are designed for max. 1,400 Nm³/h raw biogas at approx. 50% methane content.

The biogas upgrading plant consists of several machine containers, cooling water units and various outdoor containers. The supply of the operating fluids cooling water, cold water and instrument air is ensured within the plant boundaries. Only the operating fluids nitrogen and electrical power have to be supplied to the plant.

PROJECT SPONSORS

BayWa r.e. renewable energy GmbH

PROJECT PERIOD

2014 -2017

MAIN SERVICES

General contractor (phase 1-8 HOAI) for the complete handling and construction of the entire plant, consisting of production building, tank farm, administration building as well as laboratory and social buildings and parking garage.

  • Preliminary design
  • basic engineering
  • Approval procedure, including preparation of the building application documents and in connection with the application according to §4 i.V.m. §8 BImSchG
  • Detailed design and engineering
  • Preparation and participation in tendering procedures
  • Site and construction supervision

Go back